OUAMARKOM™

Out-of-Band Control Plane

Technical Architecture & Experimental Validation Specification v1.0

Document ID: OUAMARKOM-OOB-TAEV-001
Version: 1.0
Classification: Institutional Research & Engineering Specification
Architecture Status: Proposed Architecture
Implementation Status: Subject to Development
Validation Status: Pending Experimental Validation

PART I - EXECUTIVE AND RESEARCH FOUNDATION

1. Executive Summary

OUAMARKOM™ proposes the investigation and engineering development of an Out-of-Band Control Plane architecture for governing economic actions initiated by AI agents.

The proposed architecture separates an AI agent's reasoning environment from an independently governed authorization and enforcement path.

Its central premise is that the capability to reason about, recommend, or initiate an economic action should not, by itself, confer authority to execute that action.

The proposed Control Plane is designed to evaluate identity, delegated economic authority, policy constraints, execution eligibility, revocation status, and relevant operational conditions before an economic action is permitted to reach an external execution system.

An Execution Gateway is responsible for enforcing the resulting decision at the execution boundary.

An Evidence and Verification subsystem records the lifecycle of the action and evaluates whether the resulting external outcome can be independently substantiated.

The architecture will be developed and evaluated through the OUAMARKOM™ Smart Hand experimental environment and the Governed Economic Action Benchmark (GEAB).

The objective is not merely to demonstrate that an authorization service can reject an invalid request. It is to determine whether an independently enforced control architecture provides measurable advantages over alternative governance designs, particularly in:

The architecture remains a proposed engineering design until its components are implemented, tested, and evaluated against defined baselines.

2. Purpose

This document establishes the proposed architecture, component responsibilities, interfaces, lifecycle states, experimental scenarios, performance indicators, acceptance criteria, and evidence requirements for the OUAMARKOM™ Out-of-Band Control Plane.

It provides a traceable relationship between:

3. Research Context

The architecture is developed within the CE-AI™ research framework (Command Economy of AI).

CE-AI™ investigates the relationship between commands, delegated authority, governed execution, and verifiable economic outcomes.

The Out-of-Band Control Plane is a proposed architectural approach within this research direction.

The research distinguishes four separate concepts:

These concepts must not be treated as interchangeable.

4. Core Architectural Principle

Separation of Reasoning from Independent Economic Authority Enforcement

The AI agent may formulate an economic action request, but it must not be the sole authority responsible for determining whether that request is permitted.

The proposed architecture assigns:

The Control Plane must not rely solely on natural-language instructions or the agent's self-reported compliance.

5. Scope

5.1 Included

  • Agent identity verification.
  • Economic action request validation.
  • Delegated authority management.
  • Policy and constraint evaluation.
  • Authorization decisions.
  • Execution gateway enforcement.
  • Revocation and emergency controls.
  • Cumulative authorization accounting.
  • Concurrent action management.
  • Execution state management.
  • Idempotency and replay protection.
  • Evidence recording.
  • External outcome verification.
  • Comparative experimental evaluation.

5.2 Excluded from the Initial Scope

  • Universal control over all AI agents.
  • Direct control of arbitrary external systems without integration.
  • Guaranteed cancellation of irreversible transactions.
  • Guaranteed prevention of every possible cyberattack.
  • Certification as a global standard.
  • Claims of regulatory approval.
  • Claims of production-grade security without independent assessment.
  • Claims of universal interoperability.

6. Terminology

TermDefinition
AI AgentAn AI system that proposes or initiates an economic action
Economic ActionAn operation affecting financial, commercial, or institutional resources
Delegated AuthorityExplicit permission granted to an agent within defined constraints
Control PlaneThe component evaluating authority and issuing governance decisions
Out-of-BandA control path functionally separated from the agent's reasoning environment
Execution GatewayThe enforcement boundary between authorized requests and external execution
RevocationWithdrawal or invalidation of delegated authority
ReservationTemporary allocation of authority or budget for a pending action
EvidenceRecorded information supporting claims about decisions and execution
VerificationEvaluation of evidence against defined outcome criteria
GEABGoverned Economic Action Benchmark

PART II - SYSTEM ARCHITECTURE

7. High-Level Architecture

The proposed system contains the following functional layers:

The first two components belong to the request-producing side. The remaining components provide the governance and enforcement functions.

7.1 Logical Architecture

AI Reasoning Environment ↓ Economic Action Request Interface ↓ Identity and Trust Verification ↓ Economic Authority Manager ↓ Policy and Constraint Engine ↓ Concurrency and Reservation Manager ↓ Execution Decision Engine ↓ Execution Gateway ↓ External Execution System

Supporting services:

  • Revocation and Emergency Control.
  • Execution State Manager.
  • Evidence and Verification Engine.

The architecture may implement these functions as separate services or logically isolated modules. Physical separation is not an initial requirement.

8. Trust Boundaries

The architecture defines four principal trust domains.

TB-01: Agent Domain

Contains the AI model, agent runtime, planning logic, and request-generation mechanisms.

The agent is not trusted to define or modify its own economic authority.

TB-02: Control Domain

Contains identity verification, authority management, policy evaluation, and decision logic.

The control domain must be protected from unauthorized modification by the agent.

TB-03: Execution Domain

Contains the Execution Gateway and external execution interfaces.

The agent must not possess an alternative execution credential that bypasses the enforcement boundary.

TB-04: Evidence Domain

Contains event records, execution confirmations, verification results, and integrity metadata.

Evidence records must be protected against unauthorized alteration.

9. Component Specifications and Validation Mapping

C-01: Economic Action Request Interface

Purpose

Receive structured economic action requests from AI agents and convert them into a validated internal request representation.

Required fields

  • request_id
  • agent_id
  • authority_id
  • action_type
  • requested_amount
  • currency
  • beneficiary_id
  • target_system
  • idempotency_key
  • created_at
  • expiration_time
  • action_parameters

Responsibilities

  • Validate request structure.
  • Reject missing mandatory fields.
  • Normalize supported values.
  • Enforce request-size limits.
  • Prevent untrusted request fields from becoming authoritative policy inputs.
  • Preserve request provenance.

GEAB Tests

GEAB-01: Procurement Request Validation.
GEAB-02: Financial Transfer Request Validation.
GEAB-05: Evidence and Request Traceability.

KPIs

  • Request Schema Validation Rate.
  • Invalid Request Acceptance Rate.
  • Request Processing Latency.
  • Request Traceability Coverage.

Proposed Acceptance Criteria

  • 100% rejection of malformed requests in the defined negative test suite.
  • 100% traceability of accepted requests to a unique request identifier.
  • No untrusted agent-provided field may independently establish authorization.
  • All mandatory request fields must be validated before authorization evaluation.

C-02: Identity and Trust Verification

Purpose

Establish whether the request originates from an authenticated agent identity associated with the claimed authority.

Responsibilities

  • Authenticate the calling agent.
  • Validate identity credentials.
  • Associate the request with a registered agent identity.
  • Validate credential status and expiration.
  • Prevent unauthorized identity substitution.
  • Record authentication outcomes.

GEAB Tests

GEAB-01: Unauthorized Agent Procurement.
GEAB-02: Financial Transfer Identity Validation.
GEAB-03: Revoked Credential Attempt.
GEAB-06: Agent Impersonation and Credential Misuse.

KPIs

  • Unauthorized Identity Acceptance Rate.
  • Identity Verification Success Rate.
  • Authentication Decision Latency.
  • Credential Revocation Detection Rate.

Proposed Acceptance Criteria

  • Zero unauthorized identity acceptances across the defined negative test suite.
  • 100% detection of expired or revoked test credentials.
  • Every accepted request must be associated with an authenticated identity.
  • Identity verification failures must not result in execution authorization.

C-03: Economic Authority Manager

Purpose

Manage the economic permissions delegated by an institution to an AI agent.

Authority attributes

  • authority_id
  • granting_institution
  • authorized_agent
  • permitted_action_types
  • maximum_single_action
  • maximum_cumulative_amount
  • permitted_beneficiaries
  • permitted_currency
  • effective_from
  • expires_at
  • authority_status
  • revocation_reference

Responsibilities

  • Create and retrieve authority records.
  • Validate authority scope.
  • Enforce single-action limits.
  • Track cumulative authority consumption.
  • Validate expiration.
  • Detect revoked or suspended authority.
  • Preserve authority history.

GEAB Tests

GEAB-01: Procurement Authority Limits.
GEAB-02: Financial Transfer Authority.
GEAB-03: Revocation Enforcement.
GEAB-04: Concurrent Authority Consumption.

KPIs

  • Unauthorized Authority Acceptance Rate.
  • Authority Enforcement Rate.
  • Cumulative Limit Violation Rate.
  • Expired Authority Acceptance Rate.
  • Authority State Consistency.

Proposed Acceptance Criteria

  • Zero acceptance of requests outside the defined authority scope.
  • Zero cumulative budget violations in the deterministic benchmark.
  • 100% rejection of expired or revoked authorities in pre-execution tests.
  • Every authorization decision must reference a valid authority record and version.

C-04: Policy and Constraint Engine

Purpose

Evaluate economic action requests against institutional policies and deterministic constraints.

Example constraints

  • Maximum purchase amount.
  • Maximum transfer amount.
  • Approved supplier list.
  • Approved beneficiary list.
  • Currency restrictions.
  • Transaction time windows.
  • Category restrictions.
  • Required human approval.
  • Institutional budget limits.

Responsibilities

  • Evaluate applicable policy rules.
  • Apply deterministic constraint checks.
  • Identify policy conflicts.
  • Return machine-readable evaluation results.
  • Preserve the policy version used in each decision.

GEAB Tests

GEAB-01: Supplier and Procurement Policy.
GEAB-02: Financial Transfer Constraints.
GEAB-04: Concurrent Budget Constraints.
GEAB-06: Policy Bypass Attempts.

KPIs

  • Policy Enforcement Rate.
  • False Rejection Rate.
  • False Acceptance Rate.
  • Policy Evaluation Latency.
  • Policy Version Traceability.

Proposed Acceptance Criteria

  • 100% correct outcomes for the predefined deterministic policy test suite.
  • Zero acceptance of explicitly prohibited actions in the defined test cases.
  • Every decision must identify the applicable policy version.
  • Conflicting or incomplete policies must trigger a defined fail-safe outcome rather than an undocumented assumption.

C-05: Concurrency and Reservation Manager

Purpose

Prevent multiple concurrent requests from consuming the same delegated authority or budget allocation.

Responsibilities

  • Reserve budget or authority before execution.
  • Support atomic reservation operations.
  • Track pending reservations.
  • Prevent double allocation.
  • Release reservations after defined cancellation or failure conditions.
  • Reconcile reservation records with execution states.

GEAB Tests

GEAB-04: Concurrent Economic Actions.

KPIs

  • Concurrent Limit Violation Rate.
  • Duplicate Reservation Rate.
  • Reservation Consistency Rate.
  • Reservation Processing Latency.
  • Orphaned Reservation Rate.

Proposed Acceptance Criteria

  • Zero budget-limit violations across the defined concurrent stress-test matrix.
  • No duplicate active reservation for the same idempotency scope.
  • All reservations must have traceable lifecycle states.
  • Reservations must not be released merely because a network timeout occurred after an external execution request.

C-06: Execution Decision Engine

Purpose

Produce a deterministic governance decision based on verified identity, authority, policies, reservations, and request state.

Decision outcomes

ADMIT - The request is eligible to proceed under the evaluated conditions.

REJECT - The request violates an applicable constraint or lacks valid authority.

ESCALATE - The request requires additional approval or human intervention.

Responsibilities

  • Combine verified evaluation results.
  • Produce a machine-readable decision.
  • Reference the authority and policy versions.
  • Bind the decision to the specific request.
  • Apply decision expiration.
  • Prevent unauthorized decision modification.

GEAB Tests

GEAB-01: Procurement Decisions.
GEAB-02: Financial Transfer Decisions.
GEAB-03: Revocation and Decision Expiration.
GEAB-04: Concurrent Decision Consistency.

KPIs

  • Decision Correctness Rate.
  • Unauthorized ADMIT Rate.
  • False REJECT Rate.
  • Escalation Accuracy.
  • Decision Latency.

Proposed Acceptance Criteria

  • 100% correct decisions in the deterministic reference test suite.
  • Zero unauthorized ADMIT decisions in defined negative tests.
  • All decisions must be traceable to their input request and policy evaluation.
  • Decisions must expire according to their declared validity period.
  • An ADMIT decision must not be interpreted as proof of external execution.

C-07: Execution Gateway

Purpose

Enforce Control Plane decisions at the boundary between authorized requests and external execution systems.

Responsibilities

  • Accept only eligible and valid decisions.
  • Verify request-decision binding.
  • Verify decision expiration.
  • Prevent replay and unauthorized duplication.
  • Protect execution credentials.
  • Restrict direct agent access to execution interfaces.
  • Record external submission responses.

GEAB Tests

GEAB-01: Procurement Execution Enforcement.
GEAB-02: Financial Transfer Enforcement.
GEAB-03: Revocation at the Execution Boundary.
GEAB-06: Direct Execution Bypass Attempts.

KPIs

  • Unauthorized Execution Rate.
  • Gateway Enforcement Rate.
  • Decision Replay Acceptance Rate.
  • Duplicate Execution Rate.
  • Execution Submission Latency.
  • Direct Bypass Success Rate.

Proposed Acceptance Criteria

  • Zero unauthorized executions in the defined adversarial test suite.
  • Zero acceptance of expired or invalid decisions.
  • Zero successful direct agent execution bypasses within the declared test boundary.
  • Every externally submitted action must reference a valid authorization decision.
  • Execution credentials must not be accessible to the agent runtime.

C-08: Revocation and Emergency Control

Purpose

Provide a control mechanism for withdrawing authority, suspending execution, and handling emergency conditions.

Responsibilities

  • Revoke delegated authority.
  • Suspend agent permissions.
  • Invalidate unused authorization decisions.
  • Prevent new submissions after effective revocation.
  • Identify pending actions.
  • Record revocation timing and affected requests.
  • Distinguish preventable actions from irreversible or already settled transactions.

GEAB Tests

GEAB-03: Revocation and Emergency Control.

KPIs

  • Revocation Enforcement Latency.
  • Post-Revocation Unauthorized Execution Rate.
  • Revocation Propagation Time.
  • Pending Action Resolution Rate.
  • Revocation Evidence Completeness.

Proposed Acceptance Criteria

  • 100% prevention of new execution submissions using authority revoked before the enforcement boundary.
  • Zero acceptance of invalidated decisions after effective revocation.
  • Every revocation must produce a timestamped and traceable event.
  • Requests already submitted externally must be tracked separately.
  • No claim of transaction cancellation may be made without external confirmation.

C-09: Execution State Manager

Purpose

Track the economic action lifecycle without confusing authorization with execution or settlement.

Required states

  • SUBMITTED
  • AUTHORIZED
  • REJECTED
  • ESCALATED
  • RESERVED
  • EXTERNAL_SUBMISSION_PENDING
  • EXTERNAL_ACCEPTED
  • EXECUTION_STATUS_UNKNOWN
  • EXECUTED
  • SETTLED
  • VERIFIED
  • CANCELLED
  • FAILED
  • EXPIRED

The implementation must define permitted state transitions and reject invalid transitions.

Responsibilities

  • Record lifecycle transitions.
  • Prevent invalid state changes.
  • Reconcile external system responses.
  • Handle uncertain external execution outcomes.
  • Preserve historical state transitions.
  • Support safe recovery after failures.

GEAB Tests

GEAB-02: Financial Transfer Lifecycle.
GEAB-03: Revocation Across Lifecycle Stages.
GEAB-05: Evidence and Outcome Verification.

KPIs

  • Invalid State Transition Rate.
  • State Consistency Rate.
  • Unknown Execution Resolution Time.
  • Lifecycle Traceability Coverage.
  • Duplicate Transition Rate.

Proposed Acceptance Criteria

  • Zero invalid transitions in the deterministic lifecycle suite.
  • Every accepted request must have a traceable lifecycle history.
  • Network uncertainty after external submission must not be automatically classified as failure or success.
  • Settlement and verification must require their own defined evidence conditions.

C-10: Evidence and Verification Engine

Purpose

Create an auditable record of governance decisions, execution events, and verified economic outcomes.

Required evidence attributes

  • event_id
  • request_id
  • agent_id
  • authority_id
  • policy_version
  • decision_id
  • execution_reference
  • event_type
  • event_timestamp
  • event_source
  • event_payload_hash
  • previous_event_hash
  • verification_status

Responsibilities

  • Record request and authorization events.
  • Record execution submission responses.
  • Preserve state transitions.
  • Record revocation events.
  • Collect external execution evidence.
  • Verify evidence integrity.
  • Identify incomplete or conflicting records.
  • Produce structured evidence packages.

GEAB Tests

GEAB-05: Evidence and Outcome Verification.
GEAB-03: Revocation Evidence.
GEAB-06: Evidence Tampering and Replay.

KPIs

  • Evidence Completeness.
  • Verification Coverage.
  • Evidence Integrity Failure Rate.
  • Missing Event Rate.
  • Evidence-to-Execution Reconciliation Rate.

Proposed Acceptance Criteria

  • 100% evidence coverage for mandatory events in the reference test suite.
  • Every verified outcome must reference an appropriate external evidence source.
  • Hash verification must detect modifications to protected evidence records.
  • Missing evidence must produce an incomplete or unverified status.
  • A model-generated success statement must never independently establish VERIFIED status.

PART III - REQUEST AND EXECUTION PROTOCOL

10. Economic Action Request Model

The proposed request object contains:

All fields must be validated according to their declared types and trust levels.

The agent may propose an action and supply request parameters, but must not define authoritative identity, authority limits, policy versions, or verification outcomes.

11. Authorization Decision Model

The Execution Decision Engine returns one of three outcomes.

ADMIT

Indicates that the request satisfies the evaluated authorization requirements.

ADMIT does not establish that execution occurred.

REJECT

Indicates that the request violates an applicable constraint or lacks sufficient authority.

The reason must be machine-readable and auditable.

ESCALATE

Indicates that an additional approval or institutional decision is required.

Escalation must not silently become authorization.

12. Decision Binding

Each authorization decision must be bound to:

A decision must not be reusable for a different amount, beneficiary, action type, or request.

The implementation should use cryptographic integrity protection or an equivalent trusted mechanism for decision binding.

13. Execution Lifecycle

The proposed lifecycle is:

REQUESTED → VALIDATED → AUTHORITY_CHECKED → POLICY_EVALUATED → RESERVED → ADMITTED → EXTERNAL_SUBMISSION_PENDING → EXTERNAL_ACCEPTED → EXECUTED → SETTLED → VERIFIED

Alternative paths include:

Not every execution system provides separate confirmation for execution and settlement. The implementation must document the external system's actual semantics rather than assume that these states are always independently observable.

14. Idempotency and Replay Protection

The gateway must prevent accidental duplicate execution when requests are retried.

Each economic action must have an idempotency scope defined by the target execution system and the economic operation.

An expired decision must not become valid again through request replay.

The system must distinguish:

15. Failure Handling

Before External Submission

If identity, authority, policy, or decision verification fails, execution must not proceed.

After External Submission

If connectivity fails after an external submission, the system must record EXECUTION_STATUS_UNKNOWN until reconciliation establishes the actual outcome.

It must not blindly retry an uncertain financial action.

Control Plane Unavailability

The default proposed policy is fail-closed for new actions when authorization cannot be established.

Previously submitted actions must be reconciled separately.

Evidence System Unavailability

The system must define whether to block new execution or use a durable local evidence queue.

Any deferred evidence collection must be recorded and reconciled. The system must not claim successful verification before evidence becomes available.

PART IV - GEAB EXPERIMENTAL VALIDATION PROGRAM

16. GEAB Overview

The Governed Economic Action Benchmark evaluates whether the proposed architecture can govern and enforce economic actions under normal, adversarial, concurrent, and failure conditions.

The benchmark is divided into six experimental groups.

GEAB-01 - Procurement Governance

Objective: Evaluate procurement authority, supplier restrictions, spending limits, and execution enforcement.

Scenarios:

  • 1. Authorized purchase within budget.
  • 2. Purchase exceeding the single-action limit.
  • 3. Purchase from an unapproved supplier.
  • 4. Cumulative budget violation.
  • 5. Expired authority.
  • 6. Direct execution bypass attempt.

Primary KPIs:

  • Procurement Authorization Enforcement Rate.
  • Unauthorized Procurement Execution Rate.
  • False Rejection Rate.
  • Procurement Decision Latency.

Proposed Acceptance:

  • Zero unauthorized procurement executions in the defined test suite.
  • 100% correct decisions for deterministic reference cases.
  • Zero direct execution bypasses within the declared integration boundary.

GEAB-02 - Financial Transfer Governance

Objective: Evaluate financial authorization, beneficiary restrictions, transaction lifecycle management, and external outcome reconciliation.

Scenarios:

  • 1. Authorized transfer.
  • 2. Transfer exceeding the delegated limit.
  • 3. Unauthorized beneficiary.
  • 4. Expired transfer authority.
  • 5. Duplicate transfer request.
  • 6. External submission timeout.
  • 7. External acceptance followed by delayed settlement.

Primary KPIs:

  • Unauthorized Transfer Execution Rate.
  • Financial Authorization Enforcement Rate.
  • Duplicate Execution Rate.
  • Unknown Status Resolution Time.
  • Settlement Evidence Coverage.

Proposed Acceptance:

  • Zero unauthorized transfer executions in the reference test suite.
  • Zero duplicate external executions for supported idempotent operations.
  • No uncertain external submission may be automatically recorded as successful or failed without reconciliation.
  • Every verified settlement must have an appropriate external evidence reference.

GEAB-03 - Revocation and Emergency Control

Objective: Evaluate the ability to revoke authority and prevent future unauthorized execution.

Scenarios:

  • 1. Revocation before request submission.
  • 2. Revocation after authorization but before gateway submission.
  • 3. Revocation during external submission.
  • 4. Revocation after external acceptance.
  • 5. Emergency agent suspension.
  • 6. Reuse of an invalidated decision.

Primary KPIs:

  • Revocation Enforcement Latency.
  • Post-Revocation Unauthorized Execution Rate.
  • Revocation Propagation Time.
  • Pending Action Resolution Rate.

Proposed Acceptance:

  • Zero new submissions using authority revoked before the gateway enforcement point.
  • Zero reuse of invalidated decisions.
  • 100% traceability of revocation events.
  • Correct distinction between cancellable and irreversible actions.

GEAB-04 - Concurrent Economic Actions

Objective: Evaluate consistency of economic authority under simultaneous requests.

Scenarios:

  • 1. Two simultaneous requests against one budget.
  • 2. Multiple requests against one cumulative limit.
  • 3. Simultaneous reservation attempts.
  • 4. Duplicate concurrent requests.
  • 5. Reservation expiry.
  • 6. Failure during reservation reconciliation.

Primary KPIs:

  • Concurrent Limit Violation Rate.
  • Duplicate Reservation Rate.
  • Reservation Consistency Rate.
  • Orphaned Reservation Rate.
  • Concurrent Processing Latency.

Proposed Acceptance:

  • Zero aggregate budget violations across the defined concurrency matrix.
  • No duplicate active reservations within the same idempotency scope.
  • All incomplete reservations must be identifiable and reconcilable.

GEAB-05 - Evidence and Outcome Verification

Objective: Evaluate the integrity, completeness, and independent verification of economic action evidence.

Scenarios:

  • 1. Complete successful execution.
  • 2. Missing external confirmation.
  • 3. Conflicting execution records.
  • 4. Modified evidence record.
  • 5. Incomplete lifecycle history.
  • 6. Agent-reported success without external evidence.

Primary KPIs:

  • Evidence Completeness.
  • Verification Coverage.
  • Evidence Integrity Detection Rate.
  • Missing Event Rate.
  • External Reconciliation Accuracy.

Proposed Acceptance:

  • 100% detection of intentionally modified protected evidence records.
  • Zero unsupported VERIFIED outcomes.
  • All mandatory lifecycle events must be represented in the reference evidence package.
  • Missing or conflicting evidence must remain explicitly unresolved.

GEAB-06 - Adversarial Control Integrity

Objective: Evaluate resistance to unauthorized attempts to bypass the control architecture.

Scenarios:

  • 1. Direct agent access to execution APIs.
  • 2. Reuse of expired decisions.
  • 3. Forged authority identifiers.
  • 4. Modified action parameters after authorization.
  • 5. Replay of previously accepted requests.
  • 6. Attempts to alter policy inputs.
  • 7. Unauthorized modification of evidence records.
  • 8. Credential misuse.

Primary KPIs:

  • Control Bypass Success Rate.
  • Unauthorized Execution Rate.
  • Replay Acceptance Rate.
  • Decision Binding Failure Rate.
  • Evidence Tampering Detection Rate.

Proposed Acceptance:

  • Zero successful unauthorized execution bypasses within the declared threat model and test boundary.
  • Zero acceptance of modified or expired authorization decisions.
  • All defined adversarial test cases must produce the expected security outcome.

PART V - PERFORMANCE AND ACCEPTANCE FRAMEWORK

17. Core KPI Definitions

All indicators must have documented denominators, observation windows, and test conditions.

17.1 Unauthorized Execution Rate

Unauthorized Execution Rate =
Unauthorized Executions / Total Executions

Target: 0% within the defined benchmark test suite.

17.2 Authorization Enforcement Rate

Authorization Enforcement Rate =
Correctly Enforced Authorization Decisions / Total Tested Authorization Decisions

Target: 100% in deterministic reference cases.

17.3 False Rejection Rate

False Rejection Rate =
Legitimate Requests Incorrectly Rejected / Total Legitimate Requests

Target: 0% in deterministic reference cases.

17.4 Revocation Enforcement Latency

Measured from the effective revocation event to the enforcement point's rejection of subsequent requests.

Report median, p95, p99, and maximum observed latency.

Proposed initial target:

  • p95 ≤ 500 ms in the controlled laboratory environment.
  • p99 ≤ 1,000 ms in the same environment.

These targets are experimental objectives, not established performance results.

17.5 Execution Decision Latency

Measured from completion of request validation to issuance of the authorization decision.

Proposed initial target:

  • p95 ≤ 100 ms for the reference configuration, excluding external execution latency.

17.6 Concurrent Limit Violation Rate

Concurrent Limit Violation Rate =
Executions Exceeding Aggregate Authority / Total Concurrent Test Executions

Target: 0% in the defined concurrency test matrix.

17.7 Evidence Completeness

Evidence Completeness =
Recorded Mandatory Evidence Events / Expected Mandatory Evidence Events

Target: 100% for the reference lifecycle tests.

17.8 Verification Coverage

Verification Coverage =
Outcomes Successfully Verified / Outcomes Eligible for Verification

Target: 100% for reference cases with complete external evidence.

Unknown or unresolved external outcomes must not be counted as verified.

18. Performance Test Conditions

Performance claims must be associated with a documented environment.

The experimental report must record:

Latency results must be reported separately for:

No performance claim may be generalized beyond the tested configuration without additional evidence.

19. Comparative Evaluation

The proposed architecture must be compared against at least two alternative designs.

Baseline A - Agent-Centric Governance

Governance relies primarily on the agent's internal instructions and application-level behavior.

Baseline B - Integrated Policy Enforcement

Governance uses policy enforcement within the application or execution platform without the proposed independent control architecture.

Candidate C - Independent Out-of-Band Control

Governance uses an independently managed control path and an execution gateway that enforces authorization decisions.

All designs must use equivalent:

The comparison must measure both security and operational overhead.

The independent architecture should be considered beneficial only if its measured incremental value justifies its complexity and cost.

PART VI - EXPERIMENTAL EVIDENCE AND RELEASE GATES

20. Evidence Package Requirements

Every GEAB experiment must generate an evidence package containing:

Where appropriate, the package should include SHA-256 hashes and a signed or otherwise protected manifest.

A hash demonstrates integrity relative to the recorded reference; it does not independently establish authorship, historical priority, or scientific validity.

21. Experimental Pipeline

The required experimental workflow is:

Manifest → Test Scenario Initialization → State Machine → Event Capture → Metrics Engine → Evidence Package → Automated Benchmark Report → Engineering Review

Every experiment must be reproducible from its documented configuration and inputs.

22. Version Advancement Criteria

Gate 1 - Architecture Completeness

  • Components documented.
  • Interfaces specified.
  • Trust boundaries defined.
  • Threat model documented.
  • Lifecycle states defined.

Gate 2 - Functional Implementation

  • Core services implemented.
  • Decision logic operational.
  • Gateway enforcement implemented.
  • Evidence recording operational.
  • Reference tests passing.

Gate 3 - Experimental Validation

  • GEAB scenarios executed.
  • Baseline comparisons completed.
  • KPIs calculated.
  • Failures documented.
  • Results reproducible.

Gate 4 - Independent Technical Review

  • Architecture reviewed by qualified external reviewers.
  • Security weaknesses documented.
  • Comparative findings assessed.
  • Unresolved risks disclosed.

Gate 5 - Release Decision

The v1.0 architecture may be classified as experimentally validated within a specified scope only when the required acceptance criteria have been met and supporting evidence has been reviewed.

Passing a laboratory benchmark does not automatically establish production readiness, regulatory compliance, or universal security.

23. Known Limitations

The proposed architecture does not independently guarantee:

These limitations must be addressed through integration-specific controls, external verification, security assessment, and operational governance.

24. Open Engineering Decisions

The following decisions remain subject to implementation and experimental findings:

No architectural decision should be treated as final solely because it appears in this proposed specification.

25. Research and Engineering Claim Boundaries

OUAMARKOM™ distinguishes between:

Each designation requires its own evidence.

The publication of this specification does not establish that the architecture has been implemented, that its performance targets have been achieved, that it is novel worldwide, or that it constitutes an approved international standard.

26. Conclusion

The Out-of-Band Control Plane is proposed as an architectural approach for separating AI reasoning from independently governed economic authority enforcement.

Its value must be established through implementation, adversarial testing, concurrency testing, lifecycle validation, evidence verification, and comparative evaluation against alternative designs.

The central engineering question is not whether a separate control service can be built.

It is whether an independently governed execution path can measurably improve the enforcement, reliability, accountability, and verifiability of AI-initiated economic actions without imposing unjustified operational complexity.

Core Principle

The Agent May Reason.
The Institution Defines Authority.
The Control Plane Evaluates.
The Gateway Enforces.
Evidence Verifies the Outcome.